NumberGrievance
1710010Shop# 272-5A Composite Tooling is Type 6 and is machining aircraft parts. AA/TWU Aggreement. Practice to stop. (Filed On 10-11-2017)
1710009In our TWU/AA Sourcing meeting 9-29-16 project #78 Phase 2 of Roof Project we where told for plumbing and mech. that it would be new roof drains raised to meet new roof to proper height and tie on to old drain line after new P-Trap. It was word of mouth TWU did not receive project packet or scope of work. The disussions where limited due to it being a corporate realistate overseeing the job. On 9/20/17 found out Macintosh is running new trunk lines and feeler lines that should been done with planning by TWU workers. Article 1.3 of the TWU/AA agreement and TWU/AA maintaining work in house procedures 3/11/99. Follow the Facility Maintenance discussion/notification procedures Ref. 2A of the maintaining work in house procedures 3/11/99. (Filed On 09-27-2017)
1710008Title I AO mechanics attempted to perform Title II electrical work. This violates AA-TWU cba, AA safety policies regarding NFPA Arc Flash and electrical safety. Cease and desist Title II work, safety talk to AO crew and 4 hrs OT for work that I was available for. (Filed On 10-04-2017)
1710007Bruce Kern emp#303415 and supervisor Kevin Sparks went to shop 2567 & retrieved a Har3297 and brought back to dock 1A without a stock clerk - Date of violation was 9-29-17 tracking record WVPI. This is a violation of the AA/TWU agreement. I grieve for all monies due me and to be made contractually whole in every way. (Filed On 10-05-2017)
1710006On Thursday, September 28th, I was placed on a 2nd step advisory for my attendance. I feel this action was both unjust and unwarranted. This is a violation of the AA/TWU agreement. I request this advisory letter be pulled from my personnel immediately. (Filed On 09-28-2017)
1710005The company is training a non-machinist including wages for lost time and cost curriculum. AA-TWU Agreement. For the practice to stop. (Filed On 10-05-2017)
1710004I signed up for 4hrs. early for 9/28/17 overtime. I was bypassed for a person with more hours than myself was allowed to work. AA/TWU overtime guidelines. To be paid all monies due me. (Filed On 10-04-2017)
1710003By-passed for overtime on 9-20, 9-21, 9-22-17. AA/TWU Agreement. All money due & to be made whole. (Filed On 09-25-2017)
1710002By-passed for overtime on 9-20, 9-21, 9-22-17. AA/TWU Agreement. All money due & to be made whole. (Filed On 09-25-2017)
1710001I feel I was wrongly terminated. Violation of TWU, Agreement. Remployment. (Filed On 09-26-2017)
1709070See attached papers. this is a violation of the TWU-AA Agreement Article #4 - #47. Uphold what was promised on date of hire, 2 year topout with equal pay, and back pay from 8-5-16. (Filed On 09-21-2017)
1709069I became aware of an Electrician being called out to Hgr. 5C to repair a Hobart unit on Sunday Spt. 10,2017,the electrician verified the AC Power coming to unit, and saw an error code which indicated electronics in the unit was the problem. He called weekend-duty supv. back and told him the AC input is good and he should call in ELT. The ELT was not contacted. This action is unjust and a violation of the TWU/AA Agreement. CBA. We therefore request that the affected member be paid 4 hours at 1.5 x rate. (Filed On 09-15-2017)
1709068On Saturday, August 19, 2017 @ Hangar 6 Switchgear Room on 800 Amp Breaker was turned off & on. This is work that falls under the Base Utilities scope due to many factors. Base Utilities of (CBA) maintains, operates switching, & qualifications of awareness of where other areas could be affected. Appropriate shop that has the most knowledge of the sub-station rooms & it`s effects on other areas be utilized. Compensated for 8 hours @ 1.5 rate. (Filed On 08-25-2017)
1709067On Saturday, August 19, 2017 @ Hangar 6 Switchgear Room on 800 Amp Breaker was cycle off & then on. This is work that is assigned to Base Utilities Electricians. This is work I am assigned to preform, maintain equipment with-in and do this Base Wide. Violation of CBA. to make aware to others who does the work in the Sub-station-Switchgear rooms, plus. To be compensated @ 8 hrs. @ 1.5. (Filed On 08-25-2017)
1709066On Saturday, August 19, 2017 @ Hangar 6 Switchgear Room on 800 Amp Breaker was cycle off & then on. This is work that is assigned to Base Utilities Electricians. Performing work that falls under Base Utilities scope of work. Violates of CBA. To notify Base Utilities if work is in sub-station-switchgear rooms. And to be paid for 8 hours @ 1.5. (Filed On 08-25-2017)
1709065On 9.19.17 I was by passed for an airbus field trip. This is a violation of the AA/TWU agreement. I grieve to be made whole as a result of this bypass. (Filed On 09-26-2017)
1709064On 9.19.17 I was by passed for an airbus field trip. This is a violation of the AA/TWU agreement. I grieve to be made whole as a result of this bypass. (Filed On 09-26-2017)
1709063On 9.19.17 I was by passed for an airbus field trip. This is a violation of the AA/TWU agreement. I grieve to be made whole as a result of this bypass. (Filed On 09-26-2017)
1709062On 18 Sept.2017 I was issued a 2nd Step Advisory for attendance. I fee this is a violation of the ACP and TWU/AA Agreement. To have the advisory removed and be made whole. (Filed On 09-21-2017)
1709061By-passed for OT on 9-13. AA/TWU Agreement. All money due & to be made whole. (Filed On 09-16-2017)